AKTU Electrical Engineering Lab (AEE151C / AEE251C) Syllabus PDF – B.Tech 1st Year
Electrical Engineering Lab AEE151C / AEE251C
All syllabus, notes, question bank & PYQ for this subject
- English
- 1 downloads
- 0 views
Syllabus — Electrical Engineering Lab
Download PDFAEE151C / AEE251C · 1 credits · L-T-P 0-0-2
Course Objectives
- Verify Ohm's law and Kirchhoff's laws through simple DC circuit experiments relevant to lab and field instruments
- Measure AC power and power factor in equipment used in agriculture and biotechnology
- Study the fundamentals of electrical measurements and operation of measuring instruments.
- Study transformer efficiency and motor starting for agri-pump and biomedical equipment selection
- Demonstrate electrical safety, working of Fluorescent Lamp, electrical safety and protection equipment and energy measurement as core practical skills for farm and lab environment.
List of Experiments
| Exp. | Theory | Title | Objective / Description with Application Unit |
| 1 | Unit V | Electrical Safety Practices in the Laboratory | Demonstrate safe handling of electrical equipment, proper use of insulated tools, earthing, and emergency shutdown procedures. Application: Safe operation of electrical systems in laboratories and workplace |
| 2 | Unit I | Verification of KVL and KCL | Verify Kirchhoff's Voltage Law in a series circuit and Kirchhoff's Current Law in a parallel circuit. |
| 3 | Unit I | Thevenin's Theorem Verification | Find Thevenin's equivalent of a DC network; verify with different load resistors. |
| 4 | Unit II | Power and Power Factor Measurement | Connect a single-phase inductive load (choke / single-phase motor); measure voltage, current, and active power using a wattmeter; compute power factor. |
| 5 | Unit II | Power Factor Improvement Using Capacitor | Improve power factor of an inductive load by adding capacitors in steps; record reduction in line current. |
| 6 | Unit III | Measurement of DC Voltage and Current Using PMMC Instruments | Measure DC voltage and current using PMMC voltmeter and ammeter; verify the readings with a digital multimeter. Application: Battery systems, DC power supplies, and control circuits. |
| 7 | Unit III | Measurement of AC Voltage and Current Using Moving Iron (MI) Instruments | Measure AC voltage and current using MI voltmeter and ammeter; compare the readings with a digital multimeter. Application: Electrical distribution panels and industrial AC circuit |
| 8 | Unit III | Measurement of Single-Phase Power Using a Dynamometer Wattmeter | Measure active power in a single-phase circuit using a dynamometer wattmeter and verify the result by calculation. Application: Power measurement of electrical appliances and industrial loads. |
| 9 | Unit IV | Single-Phase Transformer – Load Test | Perform a load test on a step-down transformer; measure primary and secondary voltages and currents at various loads; compute efficiency and |
| 10 | Unit IV | Starting of a Three-Phase Induction Motor Using DOL Starter | Start a three-phase induction motor using a Direct-On-Line (DOL) starter and observe its operation and rotation. Application: Pumps, fans, blowers, and conveyors used in industries. |
| 11 | Unit V | Working of Fluorescent Lamp Circuit | Connect and observe the operation of a fluorescent lamp using a choke and starter; identify the function of each component. Application: Lighting systems in schools, offices, and industries. |
| 12 | Unit V | Study of Fuse and MCB Operation | Observe the operation of a fuse and Miniature Circuit Breaker (MCB) under overload and short-circuit conditions (demonstration). Application: Protection of domestic and industrial electrical installation |
Equipment / Instruments Required
- DC Regulated Power Supply and Digital Multimeters
- Resistor Kit and Rheostat
- Single-Phase AC Supply with Variac
- AC/DC Ammeters, Voltmeters and Wattmeters
- Choke Coil (Inductive Load) and Capacitor Bank
- Three-Phase Supply Panel with Balanced Star Resistive Load
- Two Single-Phase Wattmeters (for Three-Phase Power Measurement)
- Single-Phase Transformer with Load Panel
- Three-Phase Squirrel Cage Induction Motor with DOL Starter
- PMMC and Moving Iron (MI) Instruments
- Dynamometer Type Wattmeter
- Fluorescent Lamp with Choke, Starter and Lamp Holder
- MCB, Fuse Demonstration Board and Earth Continuity Tester
- Connecting Wires, Switches and Terminal Blocks
- Safety Equipment (Insulated Gloves, Safety Goggles, Fire Extinguisher and First Aid Kit)
Teaching-Learning Methodology
Each 2-hour session begins with a 10-minute pre-lab briefing linking the experiment to its theory unit and a real engineering application. Students record aim, circuit diagram, apparatus, procedure, observation table, sample calculations, result, and inference in their lab record book. A 10-minute post-lab discussion relates the experiment to emerging technologies in the stream. Continuous assessment of observation quality and conduct is maintained.
Course Outcomes
| COs | Course Outcome Statement | KL |
|---|---|---|
| CO1 | Verify Ohm's law, KVL, KCL, and Thevenin's theorem in DC circuits relevant to agri and biomedical instruments | K3 |
| CO2 | Measure AC power and power factor and demonstrate PF improvement for agri and biomedical loads | K3 |
| CO3 | Study the fundamentals of electrical measurements and operation of measuring instruments | K2 |
| CO4 | Evaluate transformer efficiency and study motor starting for laboratory setup and industrial applications. | K3 |
| CO5 | Demonstrate electrical safety, working of Fluorescent Lamp, electrical safety and protection equipment. | K2 |
Evaluation Pattern
| Sr. | Component | Marks | Weightage |
| 1. | Day-to-day performance (Observation, Circuit, Conduct) | 20 | 20% |
| 2. | Laboratory Record / File | 30 | 30% |
| 3. | End Semester Practical Examination (Experiment + Viva Voce) | 50 | 50% |
Safety Instructions
- No circuit should be energised without the instructor's approval
- Always switch OFF supply before making or changing any connection
- Three-phase experiments must be performed under direct instructor supervision
- Never exceed the rated range of any measuring instrument
- Switch off all equipment and tidy the lab bench after every session
- Study transformer efficiency and motor starting for agri-pump and biomedical equipment selection
Ratings & Reviews
No reviews yet — share your experience with this item.