AKTU Facility Planning & Design (BPI053) Syllabus PDF – B.Tech 3rd Year
Facility Planning & Design BPI053
All syllabus, notes, question bank & PYQ for this subject
- English
- Semester 5
- 0 downloads
- 0 views
Syllabus — Facility Planning & Design
Download PDFBPI053 · 3 credits · L-T-P 3-0-0
| The students will be able to | Blooms Taxonomy | |
| CO1 | Understand the group technology, Plant Layout, material handling systems, & their Constituents. | K2 |
| CO2 | Understand the various plant layout design algorithms and quantitative models. | K2 |
| CO3 | Apply various graphical and computerized layout techniques & algorithms for plant layout development. | K3 |
| CO4 | Analyze various types of plant layouts, and factors affecting facility location and its layout. | K4 |
| CO5 | Able to suggest a material handling system for a plant under given constraints. | K4 |
| CO6 | Development of part families, machine cell formation for implementation of Group Technology and their balancing. | K4 |
| CO7 | Evaluate different plant layout alternatives within given constraints. | K5 |
Unit-1 (8-Hours)
Factory Planning: Introduction, factors to be considered Plant Location and Site Selection: Objectives and importance of plant location and selection, Levels of plant location, rural, urban and suburban location of plants, factors influencing the plant location, optimum plant location, location theories.
Unit-2 (8-Hours)
Plant Layout: Introduction of production system, scope, objectives, importance, and types of plant layout, characteristics of a good plant layout, factors affecting plant layout, procedure of developing a plant layout, different graphical and computer based plant layout design techniques (e.g. ALDEP, CORELAP etc.), installation and evaluation of plant layout, optimum plant layout.
Unit-3 (8-Hours)
Group Technology: Definition, objectives, planning, part families and machine cell formation, product flow analysis, Rank order clustering, evaluation of machine cells, types of GT layout, benefits of GT, implementation of GT.
Unit-4 (8-Hours)
Line Balancing: introduction to assembly workstations, assembly line, Definitions, heuristic and analytical methods of balancing the assembly and production line, single and mixed model line balancing, alternatives to line balancing.
Unit-5 (8-Hours)
Materials Handling: Definition, scope, objectives, principles, importance, factors in materials handling problem, analysis of materials handling, types and selection of materials handling equipment’s, aids and techniques in materials handling equipment selection. Planning of material flow, advantages of planned material flow, flow planning principles, flow patterns, analysis of material flow.
Recommended Books:
- Francis, R.L., McGinnis, L.F., and White, J.A.,“Facility Layout and Location: An Analytical Approach”, Prentice Hall of India 2004
- Meyers, F.E., and Stephens, M.P., “Manufacturing Facilities Design and Material Handling”, Prentice‐ Hall, Inc. 2000
- Groover, M.P.,“Automation, Production Systems and Computer Integrated Manufacturing”,2nd 2001 Ed., Pearson Education Inc. Delhi
- Sule, D.R.,“Manufacturing Facilities‐Location, Planning, and Design”, PWS Publishing Company 1984
- Tompkins, J.A., White, J.A., Bozer,Y.A.,Frazelle, E.H.,Tanchoco, J.M., and Tervino,J.,“Facilities Planning”,2nd 1996 Ed., John Willey & Sons
Ratings & Reviews
No reviews yet — share your experience with this item.